Exo-Green

Solution 02

Effluent treatment plants (ETP)

Effluent treatment for pharmaceutical, chemical, textile, food and engineering plants. We start from your inlet analysis and consent conditions, then size the physico-chemical, biological and tertiary stages against the parameters that actually bind you.

  • Physico-chemical
  • Biological
  • Tertiary
Industrial effluent treatment plant with FRP tanks, dosing pumps and a control panel

Process and technologies

Physico-chemical

pH correction, coagulation and flocculation with CLOTMASTER and FLOCMASTER dosing to strip colour, oil and suspended load.

Biological

Aerobic or anaerobic stages sized to the biodegradable fraction; EXO-OXYGENATOR raises oxygen transfer where COD load is high.

Tertiary

Pressure sand and activated carbon filtration, then UF/RO where discharge norms or reuse targets demand it.

Sludge handling

Thickening plus filter press to reduce hazardous-sludge disposal volume and cost.

Typical performance

Inlet against outlet

Representative ranges from delivered plants. Guaranteed values are fixed against your own inlet analysis and consent conditions at proposal stage.

Industries served

  • Pharmaceutical
  • Chemical
  • Textile
  • Food processing
Typical inlet and outlet parameters for Effluent treatment plants (ETP)
ParameterInletOutlet
COD2,000–8,000 mg/L< 250 mg/L
BOD800–3,000 mg/L< 30 mg/L
TSS500–2,000 mg/L< 100 mg/L
Oil & grease50–200 mg/L< 10 mg/L

Reference

Leachate treatment plant, Bhiwandi–Atkoli, Thane

High-COD, high-TDS landfill leachate treated to discharge norms on a constrained site. 400 KLD, inlet COD 6,000–8,000 mg/L brought below 250 mg/L at the outlet, commissioned 2024.

See all projects

Other systems

01

Sewage treatment plants (STP)

Municipal and township sewage treated to CPCB/MPCB discharge and reuse norms.

03

Zero liquid discharge (ZLD)

No effluent leaves the boundary — water returns to process, salts leave as solids.

04

RO & UF systems

Membrane trains sized for the feed you actually have, not the brochure case.

All solutions

Request an assessment

Tell us your ETP requirement.

Give us the parameters you have — flow, COD, BOD, TDS, consent conditions — and an engineer responds with a treatment scheme, a footprint and an indicative cost. No obligation, no sales sequence.

  1. 01

    Share your inlet data

    Flow, COD, BOD, TDS, pH, consent conditions — whatever you have.

  2. 02

    Engineer reviews within 24 h

    A process engineer, not a sales rep, studies the parameters.

  3. 03

    Receive scheme + estimate

    Treatment train, footprint, indicative cost and next steps.

Exo-Green engineers reviewing plant data on site
Response timeEngineer replies within 24 h
You receiveScheme, footprint, indicative cost
CredentialsISO 14001:2015 · MJP approved
Site visitsMMR same week · pan-India on request

Start your assessment

All fields are reviewed by an engineer.

Response within one working day · sales@exo-green.co

Typical response time: within 24 hours

Exo-Green Enviro — water & wastewater engineering